Case studies
Two results from my earlier operations and quality roles. Client names are withheld; figures are as reported at the time.
Case 1: From SLA penalties to overachievement bonuses
Setting: a large professional-services client account in a business process services company, 2017–2019.
Problem: the account was missing its service-level agreements and paying penalties for it.
What was done:
- Analysed the existing KPIs against staffing to find where the gaps were.
- Used baseline volumes by work type to forecast future volume trends, testing several forecasting methods and keeping the most accurate. Seasonality and trend were built in.
- Turned the forecast into interval-level demand, then into a staffing plan by skill set, and changed the schedules to match.
- Recommended upskilling plans for the team, based on where the volume trends showed skills would be needed.
- Built the model in Excel on purpose, so the operations team could run and update it themselves without an analyst.
Result: the account moved from paying SLA penalties to claiming overachievement bonuses. A second client account later asked for the same staffing rebuild.
What it shows: measure first, then change the process. The fix was a better forecast and schedule, not new software, and the people who run the work could keep it going after the project ended.
Case 2: A global real-estate footprint cut by nearly 30%
Setting: a global transformation programme at a Fortune 500 company, run from the Chief Innovation Officer's office. I was a Six Sigma Black Belt on the programme.
My part: I facilitated the discovery sessions and co-led them with the project owner, and analysed the baseline data on real estate, cost and people that the decisions rested on.
Problem: before separating into two companies, the business ran a global optimisation exercise. Real estate and the number of management layers were two of the areas in scope.
What was done:
- Phase 1, real estate: reduced the global footprint from about 12 million to about 8.5 million square feet.
- Phase 2, organisation: flattened the structure from 15 levels to 12, from entry level to CEO.
Result: both phases were delivered ahead of schedule.
| Measure | Before | After |
|---|---|---|
| Real-estate footprint | 12 million sq ft | about 8.5 million sq ft |
| Organisation levels, entry to CEO | 15 | 12 |
What it shows: running discovery with the people who own the decision, and building the baseline those decisions rest on, at enterprise scale and ahead of plan.